• A&V-GAS ALBANIA
  • A&V-GAS ALBANIA
  • A&V-GAS ALBANIA
  • A&V-GAS ALBANIA

News & Updates

Romano Port SH.A 07 November 2010, 19.55
Romano port Sh.a. established in  28.October.2003 from its shareholders. The aim and continuity of this
Read More 21710 Hits 0 Ratings
MACHINERY EQUIPMENT 12 August 2008, 00.17
The charge/discharge capacity: 9.000 tonnes in 24 hours per LPG; 16.000 tonnes in 24 hours for oil
Read More 12168 Hits 0 Ratings
FIRE PROTECTION AND RESCUE SERVICES 10 August 2008, 06.30
The fire protection and rescue services raised in this society is organized in accordance with the
Read More 12268 Hits 0 Ratings
 
MACHINERY EQUIPMENT

The charge/discharge capacity: 9.000 tonnes in 24 hours per LPG; 16.000 tonnes in 24 hours for oil products

The terminal is designed by NEDECO a Dutch consortium consulting company.
The primary consultant is Witteveen + Bos which is a company with an international reputation and with more than 650 employees.
In the final design of the terminal from NEDECO are included also:

  • Batimetri Surveillance
  • Naval Study
  • Design of the building areas
  • Facilities in the shore
  • Platform with pilots and the discharge wings
  • Digging Operate
  • Base design of machinery equipment for the discharge and security
  • Assistance in tender procedures and its evaluation
  • The preparation of certification documents.

University of Tirana has been contacted and has conducted assessment and impact on the environment.

The main features of discharging services of LPG and Oil in Romano Port
The terminal facilitates supply vessels for Oil and LPG 
Porto Romano area has enough space for more fields and deposits
Application of all regulations, codes and standards.

 
 

Subscribe

Name:
Email: